| November
24 |
00:49:47Z |
|
| |
|
Press Kit |

OV-105 Endeavour
 |
Site:
Vehicle:
Launch provider:
|
Kennedy
Space Center (U.S.)
Endeavour
United
Space Alliance |
| Delayed
from Aug. 22, Sep. 6, 19, Oct. 6, Nov. 2, 10, 11, 19 and 23 |
Payload:
Mission:
Operator:
Prime:
Platform:
Launch mass:
|
STS-113 (ISS-11A)
Manned, ISS Assembly
NASA (U.S.)
Boeing Reusable Launch Systems
OV-105
115,000 kg? (with P/L) |
Payload:
Mission:
Operator:
Prime:
Launch mass:
|
ITS-P1
ISS Element
NASA (U.S.)
Boeing Reusable Launch Systems
12,193 kg |
Payload:
Mission:
Operator:
Prime:
Launch mass:
|
MEPSI
Picosat Technology
U.S. Air Force,
DARPA (U.S.)
n.a.
2 kg |
| November 28
|
07:00Z
|
|
| |
|
|

Kosmos 3M |
Site:
Vehicle:
Launch provider:
|
Plesetsk (Russia)
Kosmos 3M
AKO Polyot/Puskoviye
Uslugi |
| Delayed
from Sep. 12, Oct. 29 |
Payload:
Mission:
Operator:
Prime:
Platform:
Launch mass:
|
Al
Sat 1 (DMC-Algeria)
Disaster Monitoring
National Center for
Space Technologies (Algeria)
Surrey Satellite
Technologies Ltd.
MB-100
80 kg |
Payload:
Mission:
Operator:
Prime:
Platform:
Launch mass:
|
Mozhayets
(Zeya 2, RS-19?)
Geodesy, Education, Amateur Radio
Mozhaiskiy Military Space Engineering Academy (Russia)
NPO Prikladnoy Mekhaniki
Strela 1M?
64 kg |
Payload:
Mission:
Operator:
Prime:
Launch mass:
|
Rubin
3-DSI (not separated)
Messaging Technology
OHB-System (Germany)
OHB-System
45 kg |