| Starsem Launch Backlog | ||
|
Firm
Contracts: 5
|
Estimated
Value: 240 million US$
|
|
|
|
||
| Firm Contracts with Assigned Payloads | ||||
| Customer | Payload | Vehicle |
Contract
Date |
Comment |
| ESA | GSTB/V2 | Soyuz-Fregat |
2003 |
|
| GSTB/V2A | Soyuz-Fregat |
2003 |
||
| Venus Express | Soyuz-Fregat |
2003 |
||
| Eumetsat | Metop 1 | Soyuz/ST |
2000 |
|
| Metop 2 | Soyuz/ST |
2000 |
||
Starsem Captive Market
|
||||||||||||||||
| Firm Reservations (not accounted in the Firm Backlog) | ||||
| Customer | Payload |
Vehicle
|
Contract
Date
|
Comment |
| Alcatel Space | SkyBridge (2 sats) |
Soyuz/ST
|
-
|
for SkyBridge |
| SkyBridge
(3 sats) |
Soyuz/ST
|
-
|
for SkyBridge | |
| SkyBridge
(3 sats) |
Soyuz/ST
|
-
|
for SkyBridge | |
| SkyBridge
(3 sats) |
Soyuz/ST
|
-
|
for SkyBridge | |
| SkyBridge
(3 sats) |
Soyuz/ST
|
-
|
for SkyBridge | |
| SkyBridge
(3 sats) |
Soyuz/ST
|
-
|
for SkyBridge | |
| SkyBridge
(3 sats) |
Soyuz/ST
|
-
|
for SkyBridge | |
| SkyBridge
(3 sats) |
Soyuz/ST
|
-
|
for SkyBridge | |
| SkyBridge
(3 sats) |
Soyuz/ST
|
-
|
for SkyBridge | |
| SkyBridge
(3 sats) |
Soyuz/ST
|
-
|
for SkyBridge | |
| SkyBridge
(3 sats) |
Soyuz/ST
|
-
|
for SkyBridge | |
| Eumetsat | Metop 3 |
Soyuz/ST?
|
-
|
|
| Expected Contracts | ||||
| Customer | Payload | Vehicle |
Contract
Date |
Comment |
| CNES | Corot | Soyuz-Fregat
|
- |
Through
Arianespace Launch June 2006 |
| ESA | Galileo (2 sats) | Soyuz/ST
|
- |
Launch 2006+ |
| Galileo (2 sats) | Soyuz/ST
|
- |
Launch 2006+ | |
| Galileo (2 sats) | Soyuz/ST
|
- |
Launch 2006+ | |
| Solar Orbiter | Soyuz-Fregat
|
- |
Launch 2008/2010 | |
| USEF | SERVIS-2 | Soyuz-Fregat |
- |
Announced Sep. 2001 |
Back to the Backlogs Page | Back to the Members Area
Heavy-lift
Launch Backlogs
Arianespace
| Boeing | CGWIC |
ILS (Atlas) | ILS (Proton)
| Mitsubishi | Sea
Launch | Yuzhnoye
Medium-lift
Launch Backlogs
Antrix
| Boeing | CGWIC
I
Galaxy Express
I
Starsem
Small
Launch Systems Backlogs
Eurockot | Kosmotras
| LeoLink | Lockheed Martin
| OSC I Puskovye Uslugi